Propellant storage for the pad.
No pumps in the fill line.
Launch vehicles that burn liquid methane and liquid oxygen need a lot of cryogenic liquid on site, and they need it delivered to the vehicle the same way every time. GreenER™ Technology (U.S. Patent No. 12,455,047 B2) stores those liquids and moves them by controlled tank pressure instead of rotating pumps. Fewer moving parts between the tank farm and the vehicle. Fewer things to fail on launch day.
Why it fits a launch site
The idea is a risk transfer: take the rotating equipment out of the cryogenic transfer and replace it with simple pressure management.
No rotating pumps in the transfer path
Liquid moves to the vehicle on controlled tank pressure. The extraction pump, its seals, its motor and its backup are gone from the fill line, and so is the single point of failure they create.
No bottom penetrations
Every nozzle comes through the top of the tank. Nothing passes through the bottom, which takes the most common leak path off the pad and shrinks the containment and civil scope around it.
One architecture for every cryogen
The same storage and pressure-build approach applies to liquid oxygen, liquid methane and LNG, liquid nitrogen and liquid hydrogen. Oxygen runs in an oxygen-service configuration on the same principle.
Shop-built, with more than one fabricator
Tanks are built in a factory and shipped finished by rail or barge. Fabrication can be as early as 9 months, and the design is licensed to several qualified fabricators, so one shop is never the whole schedule.
How we work with launch teams
We add owner-side capacity around your engineers and vendors. We don't replace them. A first assignment can be one decision, with no full project definition needed.
- 1 Feasibility and concept evaluation
Demand basis, site constraints, alternatives, cost, schedule and commercial viability, run at the direction of your supply chain group and engineers.
- 2 Pre-FEED and basis of design
Process concept, codes, permitting strategy, interfaces, execution plan and a risk register, under your day-to-day direction.
- 3 Owner’s engineer and advisor
Independent technical review, procurement support, contractor oversight and decision support for your engineering team.
- 4 EPC management
Coordination of engineering, equipment, construction, controls, commissioning and vendor interfaces, at your direction and discretion.
- 5 Technology and operational readiness
GreenER™ Technology evaluation, procedures, training, startup, verification and optimization.
What we can deliver on a pad
- GreenER™ cryogenic storage systems and custom control buildings
- Fuel unloading
- Site qualification and sourcing
- Vaporizers
- Pretreatment and liquefaction
- HMI and SCADA, hardware and software
Already running, already shipping
Greenville Utilities
Two of six 77,000-gallon tanks plus the GreenER™ pressurization system in commercial operation, moving LNG by pressure with no in-tank pumps.
Five tanks, one train
Five shop-built GreenER™ tanks for a utility customer in the Southeast, loaded together for one rail move. It may be the largest single rail shipment of LNG storage tankage ever, though that has not been confirmed.
The technical brief
Tank series and package configurations, fill-rate and pressure-build sizing, nozzle architecture, the full comparison against pumped storage, and execution options. It sits behind an access code so it reaches the teams actually sizing a pad. If you were given a code, sign in. If not, ask us for one.
U.S. Patent No. 12,455,047 B2 · U.S. Provisional Patent Application No. 63/991,359