Propellant storage for the pad.
No pumps in the fill line.

Launch vehicles that burn liquid methane and liquid oxygen need a lot of cryogenic liquid on site, and they need it delivered to the vehicle the same way every time. GreenER™ Technology (U.S. Patent No. 12,455,047 B2) stores those liquids and moves them by controlled tank pressure instead of rotating pumps. Fewer moving parts between the tank farm and the vehicle. Fewer things to fail on launch day.

Why it fits a launch site

The idea is a risk transfer: take the rotating equipment out of the cryogenic transfer and replace it with simple pressure management.

No rotating pumps in the transfer path

Liquid moves to the vehicle on controlled tank pressure. The extraction pump, its seals, its motor and its backup are gone from the fill line, and so is the single point of failure they create.

No bottom penetrations

Every nozzle comes through the top of the tank. Nothing passes through the bottom, which takes the most common leak path off the pad and shrinks the containment and civil scope around it.

One architecture for every cryogen

The same storage and pressure-build approach applies to liquid oxygen, liquid methane and LNG, liquid nitrogen and liquid hydrogen. Oxygen runs in an oxygen-service configuration on the same principle.

Shop-built, with more than one fabricator

Tanks are built in a factory and shipped finished by rail or barge. Fabrication can be as early as 9 months, and the design is licensed to several qualified fabricators, so one shop is never the whole schedule.

How we work with launch teams

We add owner-side capacity around your engineers and vendors. We don't replace them. A first assignment can be one decision, with no full project definition needed.

  1. 1
    Feasibility and concept evaluation

    Demand basis, site constraints, alternatives, cost, schedule and commercial viability, run at the direction of your supply chain group and engineers.

  2. 2
    Pre-FEED and basis of design

    Process concept, codes, permitting strategy, interfaces, execution plan and a risk register, under your day-to-day direction.

  3. 3
    Owner’s engineer and advisor

    Independent technical review, procurement support, contractor oversight and decision support for your engineering team.

  4. 4
    EPC management

    Coordination of engineering, equipment, construction, controls, commissioning and vendor interfaces, at your direction and discretion.

  5. 5
    Technology and operational readiness

    GreenER™ Technology evaluation, procedures, training, startup, verification and optimization.

Valve end of a white GreenER™ cryogenic storage tank on a rail flatcar, with the rest of the five-tank train behind it
Five shop-built tanks on GreenER™ Technology loaded on one train, November 2026. Fabricated by Chart Industries, one of the approved GreenER™ Technology fabrication partners. Image courtesy of Chart Industries.

What we can deliver on a pad

  • GreenER™ cryogenic storage systems and custom control buildings
  • Fuel unloading
  • Site qualification and sourcing
  • Vaporizers
  • Pretreatment and liquefaction
  • HMI and SCADA, hardware and software
For engineers evaluating a site

The technical brief

Tank series and package configurations, fill-rate and pressure-build sizing, nozzle architecture, the full comparison against pumped storage, and execution options. It sits behind an access code so it reaches the teams actually sizing a pad. If you were given a code, sign in. If not, ask us for one.

U.S. Patent No. 12,455,047 B2 · U.S. Provisional Patent Application No. 63/991,359