Hydrogen + e-NG · The Same Pad
Today's tank.
Tomorrow's hub.
The same GreenER™ design that's running at Greenville is engineered for additive deployment of green hydrogen and e-NG — and broader cryogenics including propane, nitrogen, and methanol — without retrofit. Two U.S. integrated facility designs are ready: 200,000 MMBtu LNG + 23,760 kg/day H₂ on roughly 17 acres each.
50 MW GreenER™ Hydrogen Plants
Engineering complete with McDermott's CB&I Storage Solutions.
Two transformative 50-MW projects with proprietary electrolyzers — modular and expandable, with 15 MW of 100% hydrogen-fueled power generation per site supporting grid-scale energy storage applications.
H₂ produced per facility
~24,000 kg/day
Modular plant size
50 MW
Incremental power gen
15 MW · 100% H₂-fueled
CO₂ saved per site / year
7,384 tons
CO₂ saved per site / lifetime
221,529 tons
Production cost range
$1.37 – $2.30/kg
Where the H₂ goes
- Grid-scale H₂ blending into natural gas pipelines
- Existing or new power-generation blending
- Salt-cavern + above-ground energy storage injection
- Heat recovery on turbines
- Carbon capture integration on turbines
- Solar-integrated electric-drive liquefaction (11 – 70 MW)
CO₂ Saved · Per Site
221,529
tons over plant lifetime
Calculated on the GreenER™ Hydrogen 23,760 kg/day plant, assuming displacement of hydrogen for gasoline.
Our energy-saving system allows for more cryogenic storage on existing and greenfield sites. The double-wall cryogenic flow system enables safe and cost-effective storage while minimizing regulatory exclusion zones — saving money for our clients, offtakers, and investors.
Thomas G. Quine
Founding & Technical Partner · Patent AP 17323622
Nearly one-third — $17.1T — of U.S. professionally managed funds incorporate a sustainable investment strategy. Per Bloomberg, global ESG assets are on track to exceed $53T by 2025.
Scott Shields
Founding Partner · New Energy Development