US Patent 12,455,047 B2 · Awarded 11-2025
The design New Energy™ patented and is already deploying.
GreenER™ Technology is a ground-up rethink of peak-shaving LNG storage — engineered as cryogenic LNG bullet tanks and flat bottom tanks for utility, LDC, marine LNG bunkering, data center, virtual pipeline, and small-scale LNG applications, with a tank and pressure-build system that's simpler, safer, and future-ready for CNG, hydrogen (H₂), propane, nitrogen, methanol, e-Methane (e-NG), and other cryogenic gas and liquid molecule handling — without retrofit. Designs align with 49 CFR 193 and API 620; cryogenic and LNG pumps follow API 610.
Companion Patent
PER™ — Pipeline Energy Recovery
Recovers waste pressure and heat from existing natural gas pipelines and turbines — turning what's normally vented into electrical or process power. When paired with the GreenER™ system, PER™ can reduce electrolyzer power input costs "to as low as $0" on integrated H₂ projects (Power Magazine, 4-27-2021).
e-Methane (e-NG) Roadmap
Same pad. Same design.
The GreenER™ tank is engineered for additive deployment of most cryogenic molecules, including e-Methane (e-NG), hydrogen, nitrogen, and propane — alongside LNG, without retrofit. One footprint, multiple product paths, phased on demand.
Licensing & Deployment
GreenER™ Technology is available for license to EPC contractors, system fabricators, and on-site builders.
Chart strategic partner: Chart Industries — a $6 billion strategic partner — is already under license; the Greenville Utilities tanks were fabricated by Chart. Chart is one of several, and a growing number of, GreenER™ Technology license partners that can either fabricate or build, so New Energy Development Company LLC (New Energy™) is not exclusively tied to any single partner. ("Fab" = in a factory; "build" = on-site, for the larger tanks.)