Why New Energy™

The country needs more gas, faster — and cleaner.

The U.S. operates 169 LNG peak-shaving facilities with 62.5 Bcf of storage and 6.2 Bcf/day of deliverability. Utilities, power generators, and municipalities are hitting a wall: too much demand, not enough infrastructure, and no time for decade-long builds. New Energy™ closes that gap.

By the Numbers — Partner Experience
100+
Years Combined
Partner Experience
100s
Energy Projects
Completed
1,000s
Contractors
Appointed
$100s M
Capital Raised
& Deployed
Did You Know
New Energy™ owns a proprietary database of every LNG facility in the United States.

Site-by-site operating data, ownership, capacity, and asset history — the institutional view New Energy™ uses to scope every project it touches.

Supply Reliability

Peak-shaving LNG resolves chronic natural-gas shortages and extreme winter pricing — delivering firm supply when pipelines run thin.

Patent-Backed Design

New Energy™ tank design — US Patent 12,455,047 B2 (bullets) and Provisional Patent 63/991359 (flat-bottom) — eliminates bottom penetrations and extraction pumps, cutting civil work and O&M dramatically.

Designers · Developers · Advisors

New Energy™ doesn't just advise — New Energy™ has designed and developed peak-shaving facilities, and has stood behind every decision in commissioning and ops. New Energy™ Managing Partners have 85+ years of combined experience.

GreenER™ Path

Same footprint, additive roadmap: today's LNG tank is ready to host green hydrogen and e-NG production tomorrow.

4 Groundbreaking Improvements

Each one results in
lower installed cost & complexity.

Under U.S. Patent 12,455,047 B2, the GreenER™ LNG Storage & Pressurization System uses a full-containment, no-tank-bottom-penetration design with a simple pressure build system that provides motive force for LNG dispensing — with no pumps. Anyone can now deploy this proven technology and save money, space, and deployment schedule — and reduce project risk.

01

Modular & Pre-Engineered

Faster, simpler deployment with phased scalability.

For EPCs: a cookie-cut, pre-engineered package that saves labor hours and lets you offer LNG storage as a standard line item. For utility, marine, power and data center deployments: a strong starting point that we tailor as a one-off application of the patented technology to each site.

02

Eliminates Most Civil Work

Less impoundment. Smaller pad. Lower installed cost.

Full-containment, no-bottom-penetration design eliminates most impoundment and major civil scope, materially reducing site complexity, site size, and total installed cost.

03

Safer · Full Containment

Lower permitting risk. Faster regulatory approvals.

Safer, full-containment storage design lowers permitting risk, accelerates regulatory approvals, and improves project certainty for the rate-case timeline you actually have.

04

Simplified Pressure-Driven LNG

No extraction pumps. Less capital. Lower lifetime O&M.

Simplified, pressure-driven LNG dispensing — no extraction pumps. Reduces capital deployed and delivers structurally lower O&M over the asset life.

Close-up of a finished GreenER LNG tank loaded on a QTTX heavy-haul rail flatcar — tank diameter visibly wider than the railcar deck
Modular · Shop-Fabricated
Built in a factory. Delivered by rail. Installed in weeks — not years.
2
Utilities ordered the full system
Public + investor-grade names
+
Others finalizing orders
Pipeline filling up — capacity tightening
License-ready for fabricators & EPC
Chart Industries and others already under license