US Patent 12,455,047 B2 · Awarded 11-2025

The design New Energy™ patented and is already deploying.

GreenER™ Technology is a ground-up rethink of peak-shaving LNG storage. It's engineered as cryogenic LNG bullet tanks and flat bottom tanks for utility, LDC, marine LNG bunkering, data center, virtual pipeline, and small-scale LNG applications, with a tank and pressure-build system that's simpler, safer, and future-ready for oxygen (LOX), nitrogen (LN), hydrogen (LH2), methane (LM), propane, methanol, and other cryogenic gas and liquid molecule handling, without retrofit. Designs align with 49 CFR 193 and API 620.

Δ
Traditional vs GreenER™
The engineering delta
Bottom penetrations
Multiple
Zero
Extraction pumps
Required
Eliminated
Civil work footprint
Extensive
Reduced
Space-constrained sites
Difficult
Suitable
O&M complexity
High
Simplified
Future LH2 / LOX / LN / LM integration
Retrofit
Native path
Source: GreenER™ Technology brief — New Energy Development Company.
LNG · −260°F TO VAPORIZERS NO EXTRACTION PUMPS TOP-SIDE WITHDRAWAL NO EXTRACTION PUMPS NO BOTTOM PENETRATIONS GreenER™ TANK · US 12,455,047 B2
Rendering of a GreenER storage and pressurization system: a row of horizontal cryogenic bullet tanks with New Energy logos on a steel pipe rack with yellow handrails, a vaporizer skid, and a separate white storage tank in the foreground
The Full System
GreenER™ storage and pressurization system: bullet tanks, pressure-build skid, vaporization. No extraction pumps anywhere on the pad.
GreenER tank shell rotating on Chart Industries' blue fabrication positioners inside a clean, well-lit shop
Shop Fabrication
GreenER™ tank on Chart's positioners
Mid-fabrication GreenER LNG tank shell at Chart Industries — bare stainless wall, overhead crane visible above
In Process
Bare shell, staged for finish — controlled, repeatable, factory-grade
Companion Patent

PER™ — Pipeline Energy Recovery

Recovers waste pressure and heat from existing natural gas pipelines and turbines — turning what's normally vented into electrical or process power. When paired with the GreenER™ system, PER™ can reduce electrolyzer power input costs "to as low as $0" on integrated H₂ projects (Power Magazine, 4-27-2021).

LOX · LN · LH2 · LM Roadmap

Same pad. Same principle.

The GreenER™ tank is engineered for additive deployment of most cryogenic molecules, including nitrogen (LN), hydrogen (LH2), methane (LM), and propane, alongside LNG, without retrofit. Oxygen (LOX) runs on the same pressure-build principle in an oxygen-service configuration. One footprint, multiple product paths, phased on demand.

Licensing & Deployment
GreenER™ Technology is available for license to EPC contractors, system fabricators, and on-site builders.

Chart strategic partner: Chart Industries — a $6 billion strategic partner — is already under license; the Greenville Utilities tanks were fabricated by Chart. Chart is one of several, and a growing number of, GreenER™ Technology license partners that can either fabricate or build, so New Energy Development Company LLC (New Energy™) is not exclusively tied to any single partner. ("Fab" = in a factory; "build" = on-site, for the larger tanks.)

Talk to a Partner →
4 Groundbreaking Improvements

Each one results in
lower installed cost & complexity.

Under U.S. Patent 12,455,047 B2, the GreenER™ LNG Storage & Pressurization System uses a full-containment, no-tank-bottom-penetration design with a simple pressure build system that provides motive force for LNG dispensing — with no pumps. Anyone can now deploy this proven technology and save money, space, and deployment schedule — and reduce project risk.

01

Modular & Pre-Engineered

Faster, simpler deployment with phased scalability.

For EPCs: a cookie-cut, pre-engineered package that saves labor hours and lets you offer LNG storage as a standard line item. For utility, marine, power and data center deployments: a strong starting point that we tailor as a one-off application of the patented technology to each site.

02

Eliminates Most Civil Work

Less impoundment. Smaller pad. Lower installed cost.

Full-containment, no-bottom-penetration design eliminates most impoundment and major civil scope, materially reducing site complexity, site size, and total installed cost.

03

Safer · Full Containment

Lower permitting risk. Faster regulatory approvals.

Safer, full-containment storage design lowers permitting risk, accelerates regulatory approvals, and improves project certainty for the rate-case timeline you actually have.

04

Simplified Pressure-Driven LNG

No extraction pumps. Less capital. Lower lifetime O&M.

Simplified, pressure-driven LNG dispensing — no extraction pumps. Reduces capital deployed and delivers structurally lower O&M over the asset life.

Two finished white 450,000-gallon cryogenic tanks riding a barge past an industrial waterfront, a tugboat alongside
Modular · Shop-Fabricated
Built in a factory. Delivered by rail or barge. Installed in weeks — not years.
2
Utilities ordered the full system
Public + investor-grade names
+
Others finalizing orders
Pipeline filling up — capacity tightening
∞
License-ready for fabricators & EPC
Chart Industries and others already under license